Construction of the Çerkezköy–Kapıkule Section of the Halkalı–Kapıkule Railway Line

All railway infrastructure, superstructure, electrification, signaling, telecommunication, design, production, assembly, testing and commissioning of central control systems in the project, personnel training and technical training documentation services will be provided within the scope of the project. The route includes Çerkezköy, Büyükkarıştıran, Lüleburgaz, Babaeski and Edirne Stations. Within the scope of the works to be carried out in the project, route and foundation excavation and route filling will be completed. There are a total of three transformer stations and 33 engineering structures, including two viaducts, 16 railway bridges, 10 cut-and-cover tunnels, 53 underpasses, 59 overpasses and 193 culverts.

Employer: Republic of Turkey Ministry of Transport and Infrastructure,
Directorate General for European Union and Foreign Relations
Location: Edirne/Turkey