AKM (M4) – Kızılay Line Construction Works and the Procurement, Installation and Commissioning of Electromechanical Systems

The project covers the line between Atatürk Culture Center (AKM) and Kızılay stations, which is the continuation of the Keçiören Metro Line (M4) (approximately 3.65 kilometers long) and three stations on this line: the Gar Station, the Courthouse Station and the Kızılay Station.

• As part of the project, the construction, architectural, installation, line structure and superstructure, electromechanical systems and subsystems works on this line will be designed, procured, assembled and commissioned in a way that requires minimum maintenance.

Employer: Republic of Turkey Ministry of Transport and Infrastructure, Directorate General of Infrastructure Investments
Location: Ankara/TURKEY

GALERİ