Renovation and reconstruction of the road between 116 + 566 and 231 + 566 km (involved removal of the unexploded ammunition and the concrete-pavement, expansion of the road, renewal of the pavement, placement of an additional shoulder and construction of a culvert). Most of the bridges on the route were demolished and rebuilt. Depending on the assessments, some bridges were repaired and strengthened. The entire project was completed under conditions with high safety risks and transportation was uninterrupted.
Location: Kandahar/AFGHANISTAN Employer: The Louis Berger Group Inc.