Final Design of Bileceri Maintenance Workshop Rehabilitation Works, and Power Substation, Signalization, Railway Line & Overhead Catenary System (OCL) Construction Works (2nd Section)

The following works will be performed within the scope of the project; earthworks, excavation and filling works, including the removal and decontamination of contaminated material, demolition works, dismantling of the existing rails and railway switches, delivering the dismantled material to the employer, dismantling a total of seven buildings, including one house, and the removal of rubble from the site, railway lines, construction of ballast railway line, concrete railway line, steel column rail line, installation of railway switches, superstructures, retaining wall construction, permanent fence application, and the energizing of a railway line.

Employer: Azerbaijan Railways Incorporated
Location: AZERBAIJAN