The project involved the construction of the 61.5-kilometer Espiye–Çarşıbaşı (including Giresun passage) State Road (Giresun–Trabzon Split Road). The project required construction of 6,000 meter tunnels, 21 hydraulic bridges, 11 bridge intersections.
Employer: General Directorate of Highways
Location: Giresun / Turkey