Construction of Mecidiyeköy–Mahmutbey (Şişli–Kağıthane–Eyüp–Gaziosmanpaşa–Esenler–Bağcılar) Subway Line, Warehouse-Maintenance Area and Warehouse Connection Lines

The main line tunnels and viaducts, which are approximately 17.5 kilometers in length and run between Mecidiyeköy and Mahmutbey, are a rail public transportation system with a total of 15 stations, including drillings, cut-and-covers and viaducts. The main line will begin at the Mecidiyeköy Station to be integrated with the existing station in Mecidiyeköy. Tunnels and viaducts along the route will be built with TBM/EPB and NATM construction techniques. The line will amount to approximately 17.5 kilometers in total and conclude at the Mahmutbey Station, to be integrated with the existing Mahmutbey Station. This line will pass through six districts in total, namely: Şişli, Kağıthane, Eyüp, Gaziosmanpaşa, Esenler and Bağcılar.

Employer: İstanbul Metropolitan Municipality, Directorate of European Side Rail Systems
Location: Istanbul/TURKEY